How Long Does It Take to Build a Website? Realistic Timelines | Markora
By project typeWhere time goesDelays7-day builds

How long does it take to build a website?

The honest answer is that production time and calendar time are two different numbers, and almost everyone quotes the second while thinking about the first. Here is where the weeks actually go.

Landing page

3–5 days

Brochure site

1–2 weeks

E-commerce

2–6 weeks

Markora

7 days

By project type

Production time versus what you will be quoted.

Typical website build times by project type
ProjectProduction timeTypically quotedMarkora
Single landing page2–4 days1–2 weeks 3–5 days
Brochure site, 5–8 pages5–10 days4–6 weeks 7 days
Brand + website8–12 days6–10 weeks 10 days
Small e-commerce2–3 weeks6–12 weeks7–10 days
Large e-commerce4–8 weeks3–6 monthsQuoted
Custom applicationMonthsMonthsNot our job

Where the calendar time actually goes

Four categories, only one of which is building.

Waiting for content. The largest single cause, by a distance. Photography that has not been taken, copy that is with someone senior, product data that lives in a spreadsheet nobody owns. A design team can do nothing about any of it.

Waiting for approvals. Every additional decision-maker adds days, not hours, because the delay is scheduling rather than opinion. Three approvers on a five-page site can add two weeks by itself.

Queue time. Your project is one of several. Most agency timelines include slots where nothing happens on your build at all — which is why the quoted range is a range.

Actual production. Usually the smallest number in the list, and the only one anybody talks about in the pitch.

What makes seven days possible

Three conditions. Remove one and it is not.

The scope is fixed before the start. Written down, agreed, and not renegotiated at day four. Scope creep is not a moral failing, it is just incompatible with a fixed date.

The same people write and design. Copy is not a separate phase handed over a wall. A layout designed around real words behaves differently from one designed around placeholder text, and doing both at once removes an entire round trip.

One decision-maker, working async. Progress lands every 48 hours with a walkthrough; you respond when it suits you. No standing calls, no committee, no scheduling.

That is the entire trick. It is not that the work is done faster — it is that almost none of the waiting exists. Our web design process sets out the day-by-day version.

How to protect your own timeline

Four things that are entirely in your control.

Book the photography first. Before you engage a designer. It is the longest lead item and it is always the thing that slips.

Name one decision-maker. Someone who can approve without convening anyone. This alone routinely saves two weeks.

Write down what the site must do — the one action a visitor should take. Everything else is negotiable and the argument gets short.

Ask for the scope in writing before you pay. A supplier who cannot write it down cannot commit to a date for it either.

FAQ

Related questions.

How long does it take to build a website?
A brochure site takes one to two weeks of actual production. Most projects take four to eight weeks in the calendar, and the difference is almost entirely waiting — for content, for approvals, and for the supplier's other projects.
Why do agencies quote 6–8 weeks?
Partly because discovery, presentation and revision cycles are booked as calendar weeks rather than working days, and partly because your project shares a queue with several others. Neither is dishonest; it just means most of the quoted time is not spent building your site.
What causes the delays?
Content, overwhelmingly. Photography that has not been taken, copy that is waiting on someone senior, and approvals that need three people in agreement. Design and development are rarely the bottleneck.
Can a good website be built in a week?
Yes, if the scope is fixed, the copy is written by the same people doing the design, and there is no approval committee. Those three conditions are what make seven days possible — remove any one and it is not.

Seven days, from a fixed date agreed before you pay.

Send your current site or a short description of the business. You will get a fixed price and a fixed launch date in writing, within one business day.

Get a fixed price → See the price list

Fixed price, live in 10 daysWritten scope · 100% money-back

Start a project →
Chat with us